[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: need estimate/quote for earthquake brace-and-bolt (EBB) program



Great!
Thank you
Attached is a seismic retrofit estimate for your house. Please review and let me know if you would like to schedule an in-person appointment. During that appointment, I would do a quick inspection of your crawl space to confirm my estimate.

Retrofit Description:
Simpson Strong-Tie Universal Retrofit Foundation Plates (URFPs) will be installed around the perimeter of the foundation at a spacing of no more than 6' apart and within 12" of any corner. This locks the mudsill to the foundation. This is the lower half of the continuous load path created during the retrofit from the foundation up through the wood framing.
Simpson Strong-Tie framing anchors (L70s) will be installed around the perimeter of the foundation at a spacing of no more than 24" per Standard Plan Set A S1-4 and S2-5. This locks the bottom of the flooring system to the mudsill and is the upper half of the continuous load path obtained from the retrofit.

Thank you, Doug
--
Doug Bartholomew Bartholomew Construction
408-981-1971 www.WestCoastWalnut.com ,http://www.westcoastwalnut.com/,

--
Doug Bartholomew Bartholomew Construction
408-981-1971 www.WestCoastWalnut.com ,http://www.WestCoastWalnut.com,

Content-Type: application/pdf; name=" .pdf"
Content-Disposition: attachment; filename=" .pdf"
Content-Transfer-Encoding: base64
Content-ID: <f_lrdrfkva0>
X-Attachment-Id: f_lrdrfkva0

Bartholomew Construction

Estimate / Contract

box 255, Chicago Park, CA 95712
Doug Bartholomew

408-981-1971

http://www.westcoastwalnut.com/~doug

License # 742230

www.westcoastwalnut.com

Customer: Robert B

Phone: my-Oakland-voicemail-number

Estimate Date: 01/14/24

Address:

 ,

Email: http://dummy.us.eu.org/robert

City/ZIP:

where-I-live 

Scope of work: Voluntary seismic retrofit in accordance with Standard Plan Set 
A in crawl space along the perimeter foundation.

Item #

Description

Qty

Unit Price

1

Simpson L70 brackets

80

$

2.98

$

238.40

2

Simpson URFP SDS3 brackets

32

$

22.92

$

733.44

3

Simpson titen heavy-duty screw anchors
(20 pack)

3.2

$

39.00

$

124.80

4

Metal bracket nails (box)

2

$

15.99

$

31.98

5

Simpson # 9 1-1/2 screws (box)

2

$

11.20

$

22.40

Subtotal $

1,151.02

Sales Tax (9.38%) $

107.97

Total Materials $

1,258.99

Permit Fee $

590.00

Plan Set A Plan $

400.00

Labor $

1,800.00

Project Management and
$
Administration (30%)

1,214.70

107.966
First day of work:
Last day of work:

$

1,258.99

Drawing, scope, and upload documents
Labor x hours @ 100/hr
Overhead and Profit: 30%

1,214.697

Price

TOTAL

Please make checks payable to Bartholomew Construction
box 255, Chicago Park, CA 95712

Payment Schedule
1

Due when selecting contractor

$

1,000.00

2

Due day of installation (estimate)

$

1,263.69

3

EBB grant

$

3,000.00

Total Estimate $

5,263.69

Material quantities and permit fee are estimates. Actual amounts reflected on 
final invoice provided day of installation.
By selecting Bartholomew Construction in the EBB dashboard, homeowner agrees to 
the payment schedule listed above.
EBB grant goes directly to the contractor (Bartholomew Construction).

$

5,263.69






Why do you want this page removed?