I'll re-review this in more detail later, but, at first glance, this looks correct. > From: Production Simply Solar <http://www.simplysolar.com/~production> > Date: Wed, 15 Jun 2022 16:06:06 -0700 > > Hi Rob, > > Now that we've completed your site inspection, your project has > moved to the engineering stage and is with our designers. The > turnaround time is about 2-3 weeks to produce a plan set. You can > expect to hear from one of our designers at that time. If > there are any issues or comments regarding your proposed system, > our designer will be in touch. > > I also have to tell you how liberating it was to see a properly > labeled main service panel (photo attached). You also knew exactly > which breakers you wanted to back up and I only hope all my clients > are as easy as you are! This list below is the breakers I believe > you want to back up. Please let me know if these are not > correct. If so, I will draft up a change order to add the four > extra breakers for backup. Additionally, if you back up > eight breakers you will need to load manage. This means in the > event of a power outage, you will need to flip on and off crucial > breakers you are and are not using to avoid your system from > drawing too much power. If the inverter draws too much power, it > will malfunction and shut down. As long as you know this, you are > good to back up the breakers of your choosing. > > 1. #6 Kitchen outlets > 2. #10 Kitchen outlets > 3. #2 Bedrooms and bathroom outlets > 4. #4 Living, dining, and kitchen outlets > 5. #3 Living, kitchen, dining room lighting > 6. #1 Bedrooms and hallway lighting > 7. #18 Lighting Bathroom > 8. #8 Microwave > As always, please feel free to reach out with any questions or concerns. > Thank you, > Ally Basham Sr Project Coordinator > Production Department | Simply Solar > > (707) 285-7037 ,tel:7072857037,